Breadcrumb

  1. Home
  2. Documents
  3. Resolution Copper Groundwater Flow Model - Pred...

Resolution Copper Groundwater Flow Model - Predictive Results

Date Published
October 31, 2018
Summary

This technical memorandum presents the predictive results from the Resolution Copper (RC) groundwater flow model developed by WSP in support of the EIS for the Resolution Copper Mine plan and land exchange. Preliminary results were presented at the U.S. Forest Service Groundwater Modeling Workgroup meeting in May 2018. This document details the final results of the base case predictive simulations, consistent with the direction from the Groundwater Modeling Workgroup.

Cited In
Reference Information

Meza-Cuadra, G., C. Pantano, and D. Oliver. 2018b. Resolution Copper Groundwater Flow Model - Predictive Results. Greenwood Village, Colorado: WSP. October 31.

Meza-Cuadra, G., C. Pantano, and D. Oliver. 2018b. Resolution Copper Groundwater Flow Model - Predictive Results. Greenwood Village, Colorado: WSP. October 31.

*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.