Breadcrumb

  1. Home
  2. Documents
  3. Desert Wellfield Pumping 100-Year Drawdown Anal...

Desert Wellfield Pumping 100-Year Drawdown Analysis for ADWR Evaluation in Support of the Resolution Copper EIS

Date Published
January 23, 2020
Summary

Evaluation of potential 100-year drawdown impacts from groundwater pumping to supply the proposed RC mine. The pumping is planned to occur at the proposed Desert Wellfield, located in the east Salt River Valley (SRV) within the Phoenix Active Management Area (AMA), approximately 3.5 miles southwest from the junction of Superstition Freeway (US-60) and AZ-79 along the MARCo corridor.

Cited In
Reference Information

Barter, H., B. Bates, and T. Bayley. 2020. Desert Wellfield Pumping 100-Year Drawdown Analysis for ADWR Evaluation in Support of the Resolution Copper EIS. Project #: 605.7506. Technical memorandum. Tucson, Arizona: Montgomery and Associates. January 23.

*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.