Tim Bayley

This memorandum was written for the United States Forest Service (USFS) to document construction and results of steady-state groundwater flow modeling (Model) representing the additional engineered seepage control measures for the proposed Near West Tailings Storage Facility (TSF) designs (Alternative 2 and Alternative 3).

This memorandum was written to document model construction and results of steady-state groundwater flow modeling (Model) of the proposed Near West Tailings Storage Facility (TSF).

This memorandum was written to document model construction and results of steady-state groundwater flow modeling (Model) of the proposed Near West Tailings Storage Facility (TSF).

This technical memorandum was prepared to document preliminary results of fate and transport modeling using additional seepage controls to reduce seepage rates developed for Resolution Copper (RC) tailings storage facility (TSF) alternatives.

This technical memorandum has been issued to correct for tailings seepage rates that were recently modified in the steady-state models for tailing storage facility (TSF) Alternatives 2 and 3 (M&A 2018) per the direction of the United States Forest Service and the groundwater working group.

This technical memorandum was prepared to document groundwater transport modeling and results for TSF Alternative 6—Skunk Camp.

This technical memorandum was prepared to document groundwater transport modeling and results for TSF Alternative 5—Peg Leg.

This technical memorandum was prepared to document groundwater transport modeling and results for TSF Alternative 4—Silver King Filtered.

This technical memorandum was prepared to document a preliminary analysis of allowable seepage from the tailings storage facility (TSF) alternatives currently being considered by Resolution Copper (RC).

Summary of reconnaissance investigations at the Skunk Camp site, an alternative site for a future tailings storage facility (TSF).

Pages

Video & Materials

A video presentation – the same information introduced at each public meeting – as well as meeting materials (posters and newsletter) are available for public review.

Video - Draft EIS

Public Meeting Materials

Draft EIS Released

The Draft Environmental Impact Statement (DEIS) for the Resolution Copper Project and Land Exchange is now available for review under the 'EIS Info' tab.

Draft EIS

Comment on DEIS

Optional ways to comment on the Draft EIS are located under the 'EIS Info' and the 'Public Involvement' tabs.

Comment

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website