Date Published
December 21, 2018
Summary
This technical memorandum was prepared to document a preliminary analysis of allowable seepage from the tailings storage facility (TSF) alternatives currently being considered by Resolution Copper (RC). The analysis covers life of mine (LOM) and post-closure periods to a reasonable predictive duration of 245 years after the start of mining.
Reference Information
Gregory, C., and T. Bayley. 2018a. Estimated Preliminary Allowable Seepage from TSF Alternative Sites for Comparative Analysis. Project #: 605.1602. Technical memorandum. Tucson, Arizona: Montogomery and Associates Inc. December 21.