Alternatives Info

This document summarizes the Resolution Copper Project and Land Exchange Environmental Impact Statement (EIS) alternatives development process.

This document includes the appendices for the report that summarizes the Resolution Copper Project and Land Exchange Environmental Impact Statement (EIS) alternatives development process.

A variation of the proposed action described in the May 9, 2016, version of Resolution Copper’s General Plan of Operations, this alternative would include a split-stream tailings processing method with two tailings types.

Shares several similarities with Alternative 2; one key difference is it proposes to reduce the amount of water retained in non-potentially acid generating (NPAG) tailings as well as reduce seepage potential through on-site thickening of NPAG tailings and ‘Thin-lift’ deposition.

The only alternative proposing to use filtered tailings instead of slurry tailings. Conveyors and mobile equipment would mechanically deposit potentially acid generating tailings and non-potentially acid generating tailings in two separate, adjacent tailings storage facilities.

This alternative allows for a comparison of the impacts of slurry tailings if placed in a flatter, alluvial setting instead of an upland wash or canyon.

The location for this alternative would enable use of cross-valley embankments/dams requiring less fill to retain tailings compared to a ring-like impoundment, simplifying construction and operations.

Presentation slides from Alternative Development Public Workshop on March 22, 2017 in Gilbert, AZ.

The Forest Service held workshops to 1) update the public on the status of the EIS process 2) describe the alternatives development process, and 3) solicit input on the criteria being used to evaluate alternative tailings storage facility locations.

Temporary Contact Update

The Tonto Supervisor’s Office in Phoenix remains temporarily closed in July 2019 due to a building renovation project. As a result, questions from the media and general public regarding the Resolution Copper Project and Land Exchange should be e-mailed to John Scaggs at: john.scaggs@usda.gov

EIS Timeline - Feb 2019

  1. Proponent submits revised Plan of Operations [Sep 2014]
  2. Federal Register Notice of Intent to prepare EIS [Mar 2016]
  3. Public scoping period and scoping meetings
    [5 meetings between Mar-Jun 2016; comment period extended from 60 days to 120 days, closed Jul 18, 2016 ]
  4. Compile and review existing data
  5. Prepare project description and identify project alternatives
  6. Publish Alternatives Evaluation Report [Sep 2017]
  7. We Are Here
    Validate Baseline Information; analyze environmental effects
  8. Prepare Draft EIS
  9. Federal Register Notice of Availability of Draft EIS
  10. 90-day public review and comment period, with public meetings
  11. Respond to public comments and prepare Final EIS
  12. Federal Register Notice of Availability of Final EIS and Draft ROD
  13. 45-day Public Objection Period
  14. Resolve objections to Final EIS and draft ROD
  15. Issue Final Record of Decision

[ View Larger Version ]

Forest Points of Contact

Media & General Info
John Scaggs
jscaggs@fs.fed.us

Project Manager
Resolution Copper
Mary Rasmussen
mcrasmussen@fs.fed.us

Apache Leap Special Management Area
Apache Leap SMA website