Breadcrumb

  1. Home
  2. Documents
  3. Alternative 5: Peg Leg Water Balance - Addition...

Alternative 5: Peg Leg Water Balance - Additional BADCT Technologies to Reduce Seepage

Date Published
January 28, 2019
Summary

This technical memorandum describes an evaluation of the GoldSIM model seepage results incorporating additional seepage controls and Best Available Demonstrated Control Technologies (BADCT) such as “thin lift” deposition. The additional BADCT controls include modifying the conventional thickened tailings deposition to thin lift deposition when sufficient surface area becomes available for this method of tailings deposition to function.

Cited In
Reference Information

Kidner, L., and J. Pilz. 2019. Resolution Copper Mining - Alternative 5: Peg Leg Water Balance - Additional BADCT Technologies to Reduce Seepage. Project No. 1788500.002 TM02 Rev1. Technical memorandum. Lakewood, Colorado: Golder Associates Inc. January 28.

Kidner, L., and J. Pilz. 2019. Resolution Copper Mining - Alternative 5: Peg Leg Water Balance - Additional BADCT Technologies to Reduce Seepage. Project No. 1788500.002 TM02 Rev1. Technical memorandum. Lakewood, Colorado: Golder Associates Inc. January 28.

*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.