Breadcrumb

  1. Home
  2. Documents
  3. Results of Drilling, Construction, Equipping, a...

Results of Drilling, Construction, Equipping, and Testing at Hydrologic Test Well HRES-13

Date Published
January 5, 2012
Document Category
Report Category
Summary

This technical memorandum was prepared to summarize results of drilling, construction, and testing at hydrologic test well HRES-13. The well was installed to characterize hydrogeologic conditions and provide a monitoring location in the western part of the Apache Leap Tuff (ALT) aquifer. Monitoring data obtained from HRES-13 have been incorporated into the RCM hydrologic monitoring program.

*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.