Date Published
January 5, 2012
Document Category
Report Category
Summary
This technical memorandum has been prepared to summarize the results of drilling, construction, and testing at hydrologic test wells HRES-14 and HRES-15. The wells were installed to characterize hydrogeologic conditions in the Apache Leap Tuff on the east side of Devils Canyon, near the Devils Canyon Fault. Monitoring data obtained from HRES-14 and HRES-15 have been incorporated into the RCM hydrologic monitoring program.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.