Date Published
February 28, 2012
Document Category
Report Category
Summary
This technical memorandum was prepared to summarize results of drilling and construction at hydrologic test wells PHRES-01, PHRES-02, PHRES-03, and PHRES-04. The wells were installed to provide observation wells during the long-term pumping test at well HRES-09, and to provide locations for characterization of fracture distribution and hydraulic conductivity in the Apache Leap Tuff (ALT) aquifer in the vicinity of hydrologic test well HRES-09.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.