Summary

This technical memorandum summarizes the potential failure modes and other contributing risk factors to the Peg Leg TSF alterative that could lead to downstream impacts, and how those failure modes are addressed in design and the methodology.

Reference Information

Pilz, J. 2019. Alternative 5 - Impacts to Public Safety. Project No. 1788500.002 TM01 Rev0. Technical memorandum. Salt Lake City, Utah: Golder Associates Inc. January 11.

Pilz, J. 2019. Alternative 5 - Impacts to Public Safety. Project No. 1788500.002 TM01 Rev0. Technical memorandum. Salt Lake City, Utah: Golder Associates Inc. January 11.