Breadcrumb

  1. Home
  2. Documents

Documents

This report documents ADWR's 2019 Pinal Model, which includes annual updates, structural and other modifications to the 2014 Pinal groundwater flow model, and results from a 100-year Assured Water Supply (AWS) projection.

The purpose of this addendum is to update the process memorandum dated October 28, 2020, titled “Cumulative Effects Analysis Overview and Screening by Resource.” The original process memo served to outline the methods and screening results used for the analysis of cumulative effects within the Environmental Impact Statement (EIS) prepared for the Resolution Copper Project by disclosing:

COVER ONLY

Materials that meet the criteria of Freedom of Information Act exemptions are not posted on this website. Culturally sensitive materials not posted here fall under this criteria.

Curious about how the CAP Priority System works? Here's your explainer.

Proposal to list the monarch butterfly (Danaus plexippus), the iconic orange and black butterfly, as a threatened species and designate critical habitat under the Endangered Species Act of 1973, as amended (Act).

Assessment of the impacts of the Telegraph Fire on Arizona hedgehog cactus (AHC; Echinocereus triglochidiatus var. arizonicus) located east of the town of Superior in Pinal County, Arizona.

This technical memorandum presents predictive results from the Resolution Copper (RC) groundwater flow model developed by WSP in support of the EIS for the Resolution Copper Mine plan and land exchange.

Part 1 of response to data request on updated socioeconomic data.

This plan contains the conservation programs that are intended to guide the Phoenix AMA to meet it management goal - and these conservation programs are to be designed to achieve reductions in groundwater withdrawals.