Breadcrumb

  1. Home
  2. Documents

Documents

This report compares the floodplain and wetlands inventories for five offered lands ("Non-Federal Parcels") to the "Federal Parcel". The Non-Federal Parcels are: JX Ranch, Appleton Ranch, LX Bar Ranch, 6L Ranch, 7B Ranch. The Federal Parcel is also known as the Resolution Parcel, and will be so referenced in this report.

Bird surveys in the Resolution Study Area to establish baseline information about bird species in the area. The goals of this report are to summarize avian surveys and assemble a list of avian species in the Study Area.

Reptile and amphibian survey was conducted on the approximately 1,224-hectare Federal Parcel.

This draft technical memorandum has been prepared to summarize results of drilling, construction, and development of groundwater production well RESPW-01. The well was installed to intersect mine workings on the 4400 Mine Level adjacent to Shaft No. 8 of the Magma Mine in order to dewater that level and overlying levels.

Surveys for Arizona Hedgehog Cactus in support of Resolution Copper Mining pre-feasibility and feasibility studies to develop an underground copper mine east of Superior, Arizona. Includes an Access database compiled of all known AHC observed in surveys from 2010 through 2012.

Earth Systems was engaged to conduct kinetic geochemical testwork on tailings samples generated from pilot scale metallurgical testwork for the Resolution Copper Mine.

Surveys were conducted for special-status plant species associated with water features that occur in the vicinity of the Study Area.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system.  The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application for the facility.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.

The goals of the baseline surface water monitoring program are to: a) Refine understanding of surface water  occurrence, quantity, and quality within the study are b) Develop a baseline data set against which future potential impacts from mining may be measured, and c) Support development of an EIS.