This report summarizes the meteorological, upper-air (SoDAR1), nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona, for the fourth quarter, October 1 through December 31, 2017.

An evaluation of two areas, the West Plant and East Plant Analysis Areas, totaling approximately 3670 acres, for the presence of potential waters of the U.S.

This report summarizes the meteorological, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the second quarter, April 1-June 30, 2014.

Baseline Biology and Land Use Report describing a parcel of federal land in the Tonto National Forest. Resolution intends to obtain the Parcel by way of a land exchange with the U.S. Forest Service and to conduct studies to determine the feasibility of establishing an underground copper mine at the site.

Raptor survey was conducted on a parcel of land administered by ASLD near Florence Junction, Pinal County Arizona. The purpose of this study was to gather information on raptor use of the Far West site and to provide baseline survey information in order to analyze potential impacts of the proposed mine features in the future.

The purpose of the survey was to evaluate the occurrence and distribution of plants listed by the TNF as invasive species, hereafter called noxious weeds, within the proposed disturbance areas for Baseline Activities.

This technical memorandum has been prepared to summarize results of drilling, construction, and testing at hydrologic test wells HRES-16, HRES-17, and HRES-18. The wells were installed to characterize hydrogeologic conditions in the Apache Leap Tuff (ALT) on the east side of Devils Canyon near the JI Ranch Fault. HRES- 16 is a larger diameter well (nominal 8-inch) that was completed to provide a location for longterm aquifer testing in the ALT aquifer. Monitoring data obtained from HRES-16, HRES-17, and HRES-18 have been incorporated into the RCM hydrologic monitoring program.

Arizona hedgehog cactus surveys conducted in conformance with the monitoring requirements of the Resolution Copper Mining Pre-feasibility Activities Plan of Operations and the Tonto National Forest's Finding of No Significant Impact.

A series of stream gauges is located within the upper Queen Creek, Devil’s Canyon, and Mineral Creek watersheds, located near Superior, AZ. These gauges are owned and maintained by Resolution Copper Mining (RCM). The historical stream gauge records were analyzed by JE Fuller Hydrology & Geomorphology, Inc in order provide an assessment of the quantity and quality of the surface water data. These data were also used to characterize and quantify volumetric surface water discharge characteristics in the three watersheds.

This report summarizes the meteorological, upper-air (SoDAR1), nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona, for the third quarter, July 1 through September 30, 2017.