This technical memorandum was prepared to summarize modifications made to wells HRES-02, HRES-05, and HRES-10 in 2011.

The purpose of this traffic study is to evaluate the current and future transportation system at the proposed Resolution Copper Mine expansion without and with the project. Traffic operations were analyzed at existing, key intersections located near the proposed mining operations and facilities during construction and final operations.

This report summarizes the meteorological, upper-air (SoDAR), nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona, for the fourth quarter, October 1 through December 31, 2016.

Surveys were conducted for special-status plant species associated with water features that occur in the vicinity of the Study Area.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system.  The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application for the facility.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.

This plan describes the procedures followed by RCM for the EPS activities to prevent, control, and mitigate releases of oil and petroleum products to the environment at its RCM EPS located near the Town of Superior, in Pinal County, Arizona.

A bat survey was conducted on the approximately 1,224-hectare Federal Parcel, in the Tonto National Forest. The purpose of this survey was to determine which bat species could be confirmed present on Parcel.

Various baseline biological surveys and studies were conducted in and around where project features will be located. The goal of this report is to present results of surveys in the Study Area for: 1) riparian tree species, 2) pools and runs in the streambed, 3) fish species, 4) amphibian species, and 5) aquatic snake species.

This technical memorandum was prepared to summarize the results of a long-term aquifer test conducted at Resolution Project hydrologic characterization well HRES-4. Well HRES-4 is completed in the Apache Leap Tuff aquifer near Oak Flat, in the upper Queen Creek drainage basin of eastern Pinal County, Arizona.