Avian surveys were conducted in support of the proposed Near West tailing alternatives areas. WestLand and BIOME biologists conducted avian surveys designed to provide information on the avian species occurring in the vicinity of the Analysis Area and to determine the presence of Tonto National Forest sensitive and management indicator species, as well as species protected under the Migratory Bird Treaty Act.

This technical memorandum has been prepared to summarize results of drilling, construction, and testing at hydrologic test wells DHRES-12 and DHRES-13. Borehole DHRES-12 was drilled to characterize hydrogeologic conditions in the deep groundwater system in Cross Canyon, west of the Apache Leap escarpment, and to provide a monitoring location for the deep groundwater system during ongoing dewatering operations. DHRES-12 was abandoned prior to completion due to lost circulation and borehole instability. Well DHRES-13 was drilled at the same site to replace abandoned borehole DHRES-12.

Western Yellow-billed Cuckoo surveys were conducted in portions of Devils Canyon and Mineral Creek in the months of June through August 2011.

Phase I Environmental Site Assessment (ESA) for approximately 148 acres referred to as the Tangle Creek parcel.

Computed flood flow frequency and volume‐duration‐frequency values for points of interest on Queen Creek and Devil’s Canyon.

This Modeling Report includes a description of the methods and datasets used in the air quality modeling analyses to estimate the Resolution Project’s air quality impacts relative to the applicable Ambient Air Quality Standards (AAQS) for criteria pollutants and to Air Quality Related Values in the near-field domain.

This tech memo presents the first update of the Groundwater Assessment prepared by Golder Associates on behalf of Resolution Copper Mining.  This work is required as part of the Area-Wide Aquifer Protection Permit for the West Plant Site.  Specifically, this tech memo partially fulfills APP Compliance Schedule Item (CSI) No. 2.

This report summarizes the meteorological, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the fourth quarter, October 1-December 31, 2013.

The purpose of the Phase I assessment was to conduct non-invasive field investigations to supplement information obtained previously from published data and to plan Phase III investigations involving subsurface exploration drilling and hydrologic testing.