Breadcrumb

  1. Home
  2. Documents

Documents

Bat surveys were conducted in the project vicinity. The purpose of this project was to compile baseline data on bat species from surveys conducted in 2011 and previous surveys conducted in the vicinity in 1996, 2001, 2002, and 2004.

Data collected during this wildlife camera monitoring survey provides a preliminary inventory of wildlife species in the vicinity of the proposed project and in the broader area.

This technical memorandum has been prepared to summarize results of drilling and construction at hydrologic test well DHRES-14. DHRES-14 is located east of Devils Canyon, between the Devils Canyon Fault and JI Ranch Fault. The well was installed to characterize hydrogeologic conditions and provide a monitoring location in the Tertiary Whitetail Conglomerate and Precambrian Pinal Schist. Monitoring data obtained from DHRES-14 will be incorporated into the RCM hydrologic monitoring program.

Western Yellow-billed Cuckoo (WYBC) surveys conducted in portions of Devils Canyon and Pinto Creek in Pinal and Gila counties, Arizona.

A series of stream gauges is located within the upper Queen Creek, Devil’s Canyon, and Mineral Creek watersheds, located near Superior, AZ. These gauges are owned and maintained by Resolution Copper Mining (RCM). The historical stream gauge records were analyzed by JE Fuller Hydrology & Geomorphology, Inc in order provide an assessment of the quantity and quality of the surface water data. These data were also used to characterize and quantify volumetric surface water discharge characteristics in the three watersheds.

This report summarizes the meteorological, upper-air (SoDAR1), nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona, for the third quarter, July 1 through September 30, 2017.