Breadcrumb

  1. Home
  2. Documents

Documents

On March 15-16, 2006 Bill Burger, Curt Gill, Natalie Robb, Cori Carveth and Craig Woods surveyed the upper section of Mineral Creek from the ASARCO Dam to the headwaters at Government Springs Ranch.

The existing land use pattern of Gila County can be traced to its historical settlement by early miners, ranchers and loggers. Communities in the southern portions of the county such as Hayden, Winkelman, Miami and Globe have their roots and their patterns of development linked to early mining and mineral exploration activities. The communities of Hayden, Winkelman, Miami and Globe generally have a compact development style organized around linear streets with a traditional downtown commercial core.

Figure showing groundwater systems, Apache Leap Tuff Aquifer, Magma Mine Workings, and Resolution deposit.

American Fact Finder. ACS Demographic and Housing Estimates. 2007-2011 American Community Survey 5-Year Estimates.

This Environmental Impact Statement (EIS) describes a Proposed Action (Preferred Alternative) and alternatives to the Proposed Action for the future management of the land and resources of the Tonto National Forest.

The Verde River Basin is a relatively large basin that encompasses part of the Coconino Plateau in its northern portion with the Mogollon Rim defining its eastern boundary. It is characterized by steep canyons, rugged mountains and by broad alluvial valleys in the north and west-central portions of the basin.

The Bureau of Land Management's Legacy Rehost System called LR2000 provides reports on BLM land and mineral use authorizations for oil, gas, and geothermal leasing, rightsofways, coal and other mineral development, land and mineral title, mining claims, withdrawals, classifications, and more on federal lands or on federal mineral estate.

This management plan describes a number of management steps that will prepare the property for transfer to the Department of the Interior, and establish a long-term conservation management approach for the 7B Ranch that will integrate general management objectives with other conservation properties along this stretch of the river.

Phase I Environmental Site Assessment (ESA) for an approximately 3,500-acre site along the San Pedro River near Mammoth, Arizona, in Pinal County.

This technical memorandum was prepared to summarize results of drilling, construction, equipping, and testing at hydrologic test well DHRES-06. The well was installed to characterize hydrogeologic conditions in the deep groundwater system south of the South Boundary Fault and to provide a monitoring point for the deep groundwater system during dewatering of existing mine workings. Monitoring data obtained from DHRES-06 will be incorporated into the RCM hydrologic monitoring program.