Materials that meet the criteria of Freedom of Information Act exemptions are not posted on this website. Culturally sensitive materials not posted here fall under this criteria.
This technical memorandum describes an evaluation of the GoldSIM model seepage results incorporating additional seepage controls and Best Available Demonstrated Control Technologies (BADCT) such as “thin lift” deposition.
The purpose of this process memorandum is to describe additional supporting resource information in detail. The Transportation and Access section of Chapter 3 of the EIS includes brief summaries of the information contained in this process memorandum.
This document shows, by phase, where the 2012 Rule specifies public participation, outreach, and collaboration with minority and low-income populations, referred to collectively in this document as “environmental justice populations.”
Resolution Copper would implement a Wildlife Management Plan to discourage wildlife from entering active mining areas at the East Plant Site (EPS), West Plant Site (WPS), Tailings Storage Facility (TSF) and Filter Plant and Loadout Facility.
The text is available online with links to each figure, and as a downloadable ascii file. Illustrations are available online as screen-viewable GIFs, and as downloadable eps files suitable for printing and editing.