Breadcrumb

  1. Home
  2. Documents

Documents

All containment lines on the south, west and east are holding. Yesterday, isolated islands of vegetation burned, sometimes producing smoke visible from State Highway 60. The fire, overall, was less active than in previous days probably due to increased humidity.

The estimates are based on the 2010 Census and reflect changes to the April 1, 2010 population due to the Count Question Resolution program and geographic program revisions.

Objectives, policy, responsibility, soil characteristics, and monitoring techniques

This Allotment Management Plan implements direction established in the October 1985 Tonto National Forest Plan and 2010 Decision and April 29, 2011 appeal resolution of Millsite Allotment. This Allotment Management Plan is made part of your Term Grazing Permit in accordance of that permit.

Reclamation field studies were designed at the Phelps Dodge Morenci Mine in Arizona to evaluate the benefits of biosolids, cattle impact, and other treatment variables on soil-capped tailings.

To analyse characteristic patterns of dynamic and chronic photoinhibition within a plant community, a new technique is proposed, which is based on the long- and short-term recovery time of maximum photochemical efficiency of PSII after environmental stress.

Invasive plants are a major concern worldwide. They displace native species, decrease forage and agricultural production, alter soil nutrients and water cycling, and lower the aesthetic value of natural areas. With the increase of world travel, exotic plant introductions are on the rise.

The purpose of this process memorandum is to provide a summary of applicable Surface Water Quality Standards and a comparison with predicted annual concentrations of constituents for each alternative that is being considered for the Resolution Copper Project.

In 2016, the Recreation User Group was formed to develop a recreational trail design within the vicinity of Superior, in Pinal County, Arizona.

In response to GS-16, I have evaluated two potential issues that have been raised as part of the EIS process and risk assessment for the proposed Resolution Copper Mine and tailings storage facility (TSF).