Date Published
              January 11, 2019
          Summary
              This technical memorandum summarizes the potential failure modes and other contributing risk factors to the Peg Leg TSF alterative that could lead to downstream impacts, and how those failure modes are addressed in design and the methodology.
Reference Information
              Pilz, J. 2019. Alternative 5 - Impacts to Public Safety. Project No. 1788500.002 TM01 Rev0. Technical memorandum. Salt Lake City, Utah: Golder Associates Inc. January 11.