Breadcrumb

  1. Home
  2. Documents
  3. Authors
  4. Todd Keay

Todd Keay

This technical memorandum was prepared to summarize results of drilling, construction, equipping, and testing at hydrologic test well DHRES-06. The well was installed to characterize hydrogeologic conditions in the deep groundwater system south of the South Boundary Fault and to provide a monitoring point for the deep groundwater system during dewatering of existing mine workings. Monitoring data obtained from DHRES-06 will be incorporated into the RCM hydrologic monitoring program.

This technical memorandum was prepared to summarize results of drilling, construction, equipping, and testing at hydrologic test wells HRES-10 and HRES-11. The wells were installed to characterize hydrogeologic conditions in the Apache Leap Tuff (Tal) in the southeast extent of the Tal outcrop area near Mineral Creek. Monitoring data obtained from HRES-10 and HRES-11 will be incorporated into the RCM hydrologic monitoring program.

This technical memorandum was prepared to document results and analysis of a 60-day pumping test conducted at hydrologic test well HRES-07.

This technical memorandum was prepared to provide an interim summary of data collected at wells DHRES-01 and DHRES-02. Deep hydrogeologic test wells DHRES-01 and DHRES-02 were drilled and constructed during the period May 2 to September 10, 2008. In order to measure hydraulic heads at specific elevations in the Apache Leap Tuff (Tal) and Whitetail Conglomerate (Tw), vibrating-wire pressure transducers were grouted in the annulus between the borehole wall and conductor casing at wells DHRES-01 and DHRES-02.