Results of Drilling, Construction, Equipping, and Testing at Hydrologic Test Wells DHRES-03, DHRES-04, DHRES-05, and DHRES-05B
This technical memorandum was prepared to summarize results of drilling, construction, equipping, and testing at hydrologic test wells DHRES-03, DHRES-04, and DHRES-05/DHRES-05B. The wells were installed to characterize hydrogeologic conditions in the Gila Conglomerate and Apache Leaf Tuff west of the Concentrator Fault in the vicinity of West Plant site and to provide monitoring locations for the aquifer west of the Concentrator Fault during dewatering operations in 2010 and 2011. Groundwater level data obtained from DHRES-03, DHRES-04, and DHRES-05/DHRES-05B has been incorporated into the RCM hydrologic monitoring program.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.
Email Address Created for Land Exchange Questions
The Southwestern Region Office of Lands and Minerals Management is overseeing and administering the land exchange and appraisal process which includes the 2,422-acre Oak Flat Federal Parcel. All questions about the land exchange and appraisal process should be emailed to SM.FS.rcexinfo@usda.gov
Programmatic Agreement Info
To comply with Section 106 of the National Historic Preservation Act, the Tonto National Forest developed a Programmatic Agreement (PA) and included it in Volume 5, Appendix O of the final EIS. The PA was created in cooperation with the Advisory Council on Historic Preservation, the State Historic Preservation Office, tribes and other consulting parties. The PA contains an agreed upon process for identifying, evaluating and addressing adverse effects to historic properties associated with this undertaking.
To review Volume 5 and the PA, Download Vol 5 PDF, 27 MB.
Forest Service Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov
Apache Leap Special Management Area
Apache Leap SMA website