Documents Cited - General Plan of Operations

Documents cited in the General Plan of Operations document
Three-Point Approximations for Continuous Random Variables

Keefer, D.I. and Bodily, S.E., 1983, Three-point approximations for continuous random variables: Management Science, v. 26, p. 595-609.

PDF icon Download PDF
Low-Volume Roads Engineering Best Management Practices Field Guide

Keller, G and Sherar, J. 2003. Low-Volume Roads Engineering Best Management Practices Field Guide. July 2003.

PDF icon Download PDF
Resolution Project Tailings Characterization: Static Geochemistry

Klohn Crippen Berger (KCB). 2007. Resolution Project Tailings Characterization: Static Geochemistry, Letter Report to Resolution Copper Mining,...

PDF icon Download PDF
Resolution Project 2010 Geotechnical Testing of Tailings Samples

Klohn Crippen Berger. 2011. Resolution Project 2010 Geotechnical Testing of Tailings Samples. January 12, 2011.

PDF icon Download PDF
Resolution Copper Mining Near West Tailings Management Mine Plan of Operations Study

Klohn Crippen Berger. 2014. Resolution Copper Mining Near West Tailings Management Mine Plan of Operations Study. September 2014.

PDF icon Download PDF - Report

Temporary Contact Update

The Tonto Supervisor’s Office in Phoenix remains temporarily closed in July 2019 due to a building renovation project. As a result, questions from the media and general public regarding the Resolution Copper Project and Land Exchange should be e-mailed to John Scaggs at: john.scaggs@usda.gov

EIS Timeline - Feb 2019

  1. Proponent submits revised Plan of Operations [Sep 2014]
  2. Federal Register Notice of Intent to prepare EIS [Mar 2016]
  3. Public scoping period and scoping meetings
    [5 meetings between Mar-Jun 2016; comment period extended from 60 days to 120 days, closed Jul 18, 2016 ]
  4. Compile and review existing data
  5. Prepare project description and identify project alternatives
  6. Publish Alternatives Evaluation Report [Sep 2017]
  7. We Are Here
    Validate Baseline Information; analyze environmental effects
  8. Prepare Draft EIS
  9. Federal Register Notice of Availability of Draft EIS
  10. 90-day public review and comment period, with public meetings
  11. Respond to public comments and prepare Final EIS
  12. Federal Register Notice of Availability of Final EIS and Draft ROD
  13. 45-day Public Objection Period
  14. Resolve objections to Final EIS and draft ROD
  15. Issue Final Record of Decision

[ View Larger Version ]

Forest Points of Contact

Media & General Info
John Scaggs
jscaggs@fs.fed.us

Project Manager
Resolution Copper
Mary Rasmussen
mcrasmussen@fs.fed.us

Apache Leap Special Management Area
Apache Leap SMA website