Documents Cited - General Plan of Operations

Documents cited in the General Plan of Operations document
Resolution Pre-Feasibility Activities Plan of Operations

Resolution Copper Mining. 2010. Resolution Pre-Feasibility Activities Plan of Operations (#03-12-02-006). October 1, 2010.

PDF icon Download PDF
Resolution Copper Mining Community Working Group Meeting Summaries

Resolution Copper Mining. 2013. Resolution Copper Mining Community Working Group Meeting Summaries. June 25, 2013 through July 31, 2013.

PDF icon Download PDF
Thumbnail image of Resolution Copper Land Exchange Proposal - August 2015 Resolution Copper Mining Land Exchange Proposal

Resolution Copper Mining. 2015. Resolution Copper Mining, LLC Land Exchange Proposal. August 2015.

PDF icon Download PDF
Thumbnail image of the General Plan of Operations: Resolution Copper Mining General Plan of Operations

Resolution Copper Mining. 2016. General Plan of Operations, Resolution Copper Mining. Initial Submittal November 15, 2013; Revised May 9, 2016.

PDF icon Download PDF - Volume 1
Compilation Geologic Map of the Ray-Superior area, Central Arizona

Richard, S.M. and Spencer, J.E., 1998, Compilation Geologic Map of the Ray-Superior area, Central Arizona: Arizona Geological Survey Open-file Report 98-13, 47 p...

PDF icon Download PDF
RocLab 1.0 Tutorial Manual

Rocscience. 2007. Tutorial Manual (pages 1-1 through 1-19).

PDF icon Download PDF
Displacement across the Cholame Segment of the San Andreas Fault between 1855 and 1893 from Cadastral Surveys

Runnerstrom, E.E., Grant, L.B., Arrowsmith, J.R., Rhodes, D.D., and Stone, E.M., 2002, Displacement across the Cholame segment of the San Andreas Fault between...

PDF icon Download PDF

EIS Status Update - March 2019

Screenshot of EIS Status Update document cover

Information on the forthcoming Draft EIS is now available under the ‘EIS Info’ tab. To view the update, click here.

EIS Timeline - Feb 2019

  1. Proponent submits revised Plan of Operations [Sep 2014]
  2. Federal Register Notice of Intent to prepare EIS [Mar 2016]
  3. Public scoping period and scoping meetings
    [5 meetings between Mar-Jun 2016; comment period extended from 60 days to 120 days, closed Jul 18, 2016 ]
  4. Compile and review existing data
  5. Prepare project description and identify project alternatives
  6. Publish Alternatives Evaluation Report [Sep 2017]
  7. We Are Here
    Validate Baseline Information; analyze environmental effects
  8. Prepare Draft EIS
  9. Federal Register Notice of Availability of Draft EIS
  10. 90-day public review and comment period, with public meetings
  11. Respond to public comments and prepare Final EIS
  12. Federal Register Notice of Availability of Final EIS and Draft ROD
  13. 45-day Public Objection Period
  14. Resolve objections to Final EIS and draft ROD
  15. Issue Final Record of Decision

[ View Larger Version ]

Forest Points of Contact

Media & General Info
John Scaggs
jscaggs@fs.fed.us

Project Manager
Resolution Copper
Mary Rasmussen
mcrasmussen@fs.fed.us

Apache Leap Special Management Area
Apache Leap SMA website