Documents Cited - General Plan of Operations

Documents cited in the General Plan of Operations document
Correlation of Response Spectral Values for Multi-Component Ground Motions

Baker J.W. and Cornell C.A., 2006, Correlation of response spectral values for multi-component ground motions: Bulletin of the Seismological Society of America,...

PDF icon Download PDF
The Conditional Mean Spectrum: A Tool for Ground Motion Selection

Baker, J.W., 2011, The conditional mean spectrum: A tool for ground motion selection,” American Society of Civil Engineers, Journal of Structural Engineering, v...

PDF icon Download PDF
Relocation Study of Early Arizona Earthquakes: Events of 1906, 1910, and 1912

Bausch, D. and Brumbaugh, D.A., 1997, Relocation study of early Arizona earthquakes: Events of 1906, 1910, and 1912: unpublished report prepared for Arizona...

PDF icon Download PDF
Nonlinear Soil-Site Effects in Probabilistic Seismic-Hazard Analysis

Bazzurro, P. and Cornell, C.A., 2004, Nonlinear soil-site effects in probabilistic seismic-hazard analysis: Bulletin of the Seismological Society of America, v....

PDF icon Download PDF
Resolution Copper Mine Pre-Feasibility Study Refrigeration and Ventilation Strategy

BBE Consulting Morvent Mining. 2012. Resolution Copper Mine Pre-Feasibility Study Refrigeration and Ventilation Strategy. October 2012.

PDF icon Download PDF
Engineering Rock Mass Classifications

Bieniawski, Z.T. 1989. Engineering Rock Mass Classifications a Complete Manual for Engineers and Geologists in Mining, Civil and Petroleum Engineering.

PDF icon Download PDF
Ground Motion Predictive Equations for the Average Horizontal Component of PGA, PGV, and 5% Damped PSA at Spectral Periods...

Boore, D.M., and Atkinson, G.M., 2008, Ground motion predictive equations for the average horizontal component of PGA, PGV, and 5% damped PSA at spectral periods...

PDF icon Download PDF
Biotic Communities of the American Southwest: United States and Mexico

Brown, D.E. (ed). 1994. Biotic Communities of the American Southwest: United States and Mexico. Desert Plants 4(1-4):1-342. University of Utah Press. Salt Lake...

PDF icon Download PDF
Biotic Communities of the Southwest

Brown, David E.; Lowe C. H. 1980. Biotic communities of the Southwest. GTR-RM-78. Fort Collins, CO: US Department of Agriculture, Forest Service. Rocky Mountain...

PDF icon Download PDF
A Tectonic Boundary for the Southern Colorado Plateau

Brumbaugh, D. S., 1987, A tectonic boundary for the Southern Colorado Plateau: Tectonophysics, v. 136, p. 125-136.

PDF icon Download PDF

EIS Status Update - March 2019

Screenshot of EIS Status Update document cover

Information on the forthcoming Draft EIS is now available under the ‘EIS Info’ tab. To view the update, click here.

EIS Timeline - Feb 2019

  1. Proponent submits revised Plan of Operations [Sep 2014]
  2. Federal Register Notice of Intent to prepare EIS [Mar 2016]
  3. Public scoping period and scoping meetings
    [5 meetings between Mar-Jun 2016; comment period extended from 60 days to 120 days, closed Jul 18, 2016 ]
  4. Compile and review existing data
  5. Prepare project description and identify project alternatives
  6. Publish Alternatives Evaluation Report [Sep 2017]
  7. We Are Here
    Validate Baseline Information; analyze environmental effects
  8. Prepare Draft EIS
  9. Federal Register Notice of Availability of Draft EIS
  10. 90-day public review and comment period, with public meetings
  11. Respond to public comments and prepare Final EIS
  12. Federal Register Notice of Availability of Final EIS and Draft ROD
  13. 45-day Public Objection Period
  14. Resolve objections to Final EIS and draft ROD
  15. Issue Final Record of Decision

[ View Larger Version ]

Forest Points of Contact

Media & General Info
John Scaggs
jscaggs@fs.fed.us

Project Manager
Resolution Copper
Mary Rasmussen
mcrasmussen@fs.fed.us

Apache Leap Special Management Area
Apache Leap SMA website