Documents Cited - General Plan of Operations

Documents cited in the General Plan of Operations document
A Bilinear Source-Scaling Model for M–log A Observations of Continental Earthquakes

Hanks, T.C. and Bakun, W.H., 2002, A bilinear source-caling model for M-log A observations of continental earthquakes: Bulletin of the Seismological Society of...

PDF icon Download PDF
A Moment Magnitude Scale

Hanks, T.C. and Kanamori, H. 1979, A moment magnitude scale: Journal of Geophysical Research, v. 84, p. 2348-2350.

PDF icon Download PDF
Resolution Project Geochemistry: Prediction of Block Cave Water Chemistry

Hatch (2015) Resolution Project Geochemistry: Prediction of Block Cave Water Chemistry. Draft report prepared by Hatch for Resolution Copper Mining, January 8,...

PDF icon Download PDF
Geology and Exploration Progress at the Resolution Porphyry Cu-Mo Deposit, Arizona

Hehnke, C., Ballantyne, G., Martin, H., Hart, W., Schwartz, A., and Stein, H. 2012. Geology and Exploration Progress at the Resolution Porphyry Cu-Mo Deposit:...

PDF icon Download PDF
Fracture and Dike Patterns in Laramide Plutons and Their Structural and Tectonic Implications

Heidrick, T.L., and Titley, S.R. 1982. Fracture and dike patterns in Laramide plutons and their structural and tectonic implications, in Titley, S.R., ed.,...

PDF icon Download PDF
Study and Interpretation of the Chemical Characteristics of Natural Water

Hem, J.D. 1985. Study and Interpretation of the Chemical Characteristics of Natural Water. U.S. Geological Survey Water-Supply Paper No. 2254, 3rd...

PDF icon Download PDF
Surficial Geology of the Superstition Mountain Piedmont Area, Northern Pinal and Eastern Maricopa Counties, Arizona

Huckleberry, G., 1993, Surficial Geology of the Supersition Mountain Piedmont Area, Northern Pinal and Eastern Maricopa Counties, Arizona: OFR-93-15, scale 1:24,...

PDF icon Download PDF

EIS Status Update - March 2019

Screenshot of EIS Status Update document cover

Information on the forthcoming Draft EIS is now available under the ‘EIS Info’ tab. To view the update, click here.

EIS Timeline - Feb 2019

  1. Proponent submits revised Plan of Operations [Sep 2014]
  2. Federal Register Notice of Intent to prepare EIS [Mar 2016]
  3. Public scoping period and scoping meetings
    [5 meetings between Mar-Jun 2016; comment period extended from 60 days to 120 days, closed Jul 18, 2016 ]
  4. Compile and review existing data
  5. Prepare project description and identify project alternatives
  6. Publish Alternatives Evaluation Report [Sep 2017]
  7. We Are Here
    Validate Baseline Information; analyze environmental effects
  8. Prepare Draft EIS
  9. Federal Register Notice of Availability of Draft EIS
  10. 90-day public review and comment period, with public meetings
  11. Respond to public comments and prepare Final EIS
  12. Federal Register Notice of Availability of Final EIS and Draft ROD
  13. 45-day Public Objection Period
  14. Resolve objections to Final EIS and draft ROD
  15. Issue Final Record of Decision

[ View Larger Version ]

Forest Points of Contact

Media & General Info
John Scaggs
jscaggs@fs.fed.us

Project Manager
Resolution Copper
Mary Rasmussen
mcrasmussen@fs.fed.us

Apache Leap Special Management Area
Apache Leap SMA website