Breadcrumb

  1. Home
  2. Documents

Documents

Raptor studies were conducted within the proposed Near West Tailings alternative area to provide baseline biological information to support planning and permitting activities.

This technical memorandum has been prepared to summarize the results of drilling, construction, and testing at hydrologic test wells HRES-14 and HRES-15. The wells were installed to characterize hydrogeologic conditions in the Apache Leap Tuff on the east side of Devils Canyon, near the Devils Canyon Fault. Monitoring data obtained from HRES-14 and HRES-15 have been incorporated into the RCM hydrologic monitoring program.

Arizona hedgehog cactus survey was conducted along areas proposed for pre-feasibility activities.

This Phase I Environmental Site Assessment (ESA) is for approximately 147 acres referred to as Turkey Creek, also known as the JX Bar Ranch and J Slash X Ranch.

This report presents a flood-duration flow frequency analysis for selected durations (1 day, 3 day, 7 day, 15 day, and 30 day) at 173 streamgaging stations throughout Arizona and in western New Mexico.

This Modeling Report includes a description of the methods and datasets used in the air quality modeling analyses to estimate the Resolution Project’s air quality impacts relative to the applicable Ambient Air Quality Standards (AAQS) for criteria pollutants and to Air Quality Related Values (AQRV) in the near-field domain and in several Class I Wilderness Areas in the far-field domain.