The purpose of this process memorandum is to describe additional supporting resource information in detail. The Transportation and Access section of Chapter 3 of the EIS includes brief summaries of the information contained in this process memorandum.
This document shows, by phase, where the 2012 Rule specifies public participation, outreach, and collaboration with minority and low-income populations, referred to collectively in this document as “environmental justice populations.”
Resolution Copper would implement a Wildlife Management Plan to discourage wildlife from entering active mining areas at the East Plant Site (EPS), West Plant Site (WPS), Tailings Storage Facility (TSF) and Filter Plant and Loadout Facility.
The text is available online with links to each figure, and as a downloadable ascii file. Illustrations are available online as screen-viewable GIFs, and as downloadable eps files suitable for printing and editing.
Predicting the potential behavior and effects of wildland fire is an essential task in fire management. Mathematical surface fire behavior and fire effects models and prediction systems are driven in part by fuelbed inputs such as load, bulk density, fuel particle size, heat content, and moisture of extinction.
Whitlow Ranch Dam is an ungated flood risk management structure located on Queen Creek in Pinal County, Ariz., about 50 miles southeast of Phoenix and about seven miles northeast of Florence Junction.