The purpose of this investigation was to assess the Property and surrounding areas to identify the presence or potential presence of recognized environmental conditions (RECs) potentially resulting in environmental impacts to the Property.
This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application for the facility.
This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.
This report summarizes the meteorological, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the first quarter, January 1-March 31, 2015.
An ecological overview for an approximately 357-hectare site in Santa Cruz County, Arizona. This evaluation of the property was conducted to: Identify the types and relative condition of the biological resources found; Evaluate the ecological characteristics; Identify remarkable resource attributes and; Briefly assess the resource conservation values and opportunities in reference to local and regional contexts.
Raptor survey near Superior, Arizona. The purpose of the survey was to locate raptor nesting territories and to monitor locations of previous raptor sightings to contribute to the baseline of information that will be available to analyze potential impacts of proposed mine features.
Arizona hedgehog cactus surveys were conducted in conformance with the monitoring requirements of the Resolution Pre-feasibility Activities Plan of Operations and the Tonto National Forest's Finding of No Significant Impact.
Gila County was created in 1881 from portions of Maricopa and Pinal counties, and later included part of Yavapai County. The county covers 4,796 square miles and is a source of great mineral wealth. The Globe Mining District, originally located on the San Carlos Indian Reservation, was reallocated to Gila County.
This technical memorandum presents the “Well Installation Report” for new point of compliance (POC) and alert wells prepared by Golder Associates Inc. (Golder) on behalf of Resolution Copper Mining Company LLC (RCML) as part of their area-wide Aquifer Protection Permit (APP), No. P-101703.