Resolution Copper Company commissioned Golder and Associates to establish a program for the collection of baseline surface water data near the future RCC mine and associated facilities. The intended uses of the data are primarily to support and EIS, develop a sound conceptual site model as a basis for predicting future impacts, and document current conditions as a baseline for judging future impacts.
This report summarizes the meteorological, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the third quarter, July 1-September 30, 2013.
This tech memo has been prepared to summarize results of the Phase II field investigations of the Near West site, conducted in support of RCM's ongoing prefeasibility studies for storage of RCM mine tailings. The purpose of Phase II investigations was to conduct electrical resistivity surveys to assess the potential occurrence of shallow groundwater at the Near West site.
Three motion-sensitive cameras besides springs within a study area along Devils Canyon. Cameras captured numerous identifiable images of animals representing both mammals and bird species.
Avian surveys were conducted in support of the proposed Near West tailing alternatives areas. WestLand and BIOME biologists conducted avian surveys designed to provide information on the avian species occurring in the vicinity of the Analysis Area and to determine the presence of Tonto National Forest sensitive and management indicator species, as well as species protected under the Migratory Bird Treaty Act.
This technical memorandum has been prepared to summarize results of drilling, construction, and testing at hydrologic test wells DHRES-12 and DHRES-13. Borehole DHRES-12 was drilled to characterize hydrogeologic conditions in the deep groundwater system in Cross Canyon, west of the Apache Leap escarpment, and to provide a monitoring location for the deep groundwater system during ongoing dewatering operations. DHRES-12 was abandoned prior to completion due to lost circulation and borehole instability. Well DHRES-13 was drilled at the same site to replace abandoned borehole DHRES-12.
This Modeling Report includes a description of the methods and datasets used in the air quality modeling analyses to estimate the Resolution Project’s air quality impacts relative to the applicable Ambient Air Quality Standards (AAQS) for criteria pollutants and to Air Quality Related Values in the near-field domain.