Breadcrumb

  1. Home
  2. Documents

Documents

The goal of this sensitivity analysis is to test a 10 percent margin of error on traffic volumes predictions for each intersection movement and see if this would impact the suggested mitigations or conclusions presented in the TIAs.

Email communication with supplemental list of mitigation suggestions from public comments in draft EIS.

The evaluation reaffirms the conclusions of the DEIS that the National Ambient Air Quality Standards (NAAQS) will not be exceeded – including when using the mining-sector specific average silt content values recommended by EPA.

The decision is to adjust the 2007 Interim Guidelines for Lower Basin shortages and coordinated operations of Lake Powell and Lake Mead as described under Section IX of this 2024 Near-term Colorado River Operations ROD.

The scope of this Master Water Plan will detail the water infrastructure needed to serve the Auction Property and will provide a regional framework for the anticipated infrastructure needed for the surrounding area around Development Units 1 & 2 totaling approximately 5,307 acres (Retained Property).

The paper presents a review of carbon footprints (CF) for Cu and Zn produced from primary and secondary raw materials by analyzing data taken from scientific literature and the Ecoinvent database.

Based on available information, I have determined waters of the United States do not occur on the project site. The basis for our determination can be found in the enclosed Memorandum for Record.

The Arizona National Scenic Trail Comprehensive Plan is a long-term programmatic plan that fulfills the legislative requirements described in Section 5(e) of the National Trails System Act (Pub.L. 90-543, as amended) (NTSA).

Nothing submitted with this correspondence represented new information that had not already been considered during the NEPA process. The purpose of this process memorandum (process memo) is to detail the disposition of the items submitted.

Resolution Copper has collected meteorological and air quality data to support several efforts during the pre-feasibility and other mine development phases for the Resolution Copper project.  This report characterizes baseline air quality and meteorological conditions for the project site and the nearby region.