This document presents the monitoring and quality assurance project plan for a meteorological monitoring program to be implemented for Resolution Copper Company for a copper mine in Pinal County Arizona. The objectives of the monitoring program are to provide the measurements necessary to establish meteorological conditions that affect the transport and dispersion of emissions from potential sources at the future Resolution facility.
This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.
This report summarizes the meteorological, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the first quarter, January 1-March 31, 2015.
An ecological overview for an approximately 357-hectare site in Santa Cruz County, Arizona. This evaluation of the property was conducted to: Identify the types and relative condition of the biological resources found; Evaluate the ecological characteristics; Identify remarkable resource attributes and; Briefly assess the resource conservation values and opportunities in reference to local and regional contexts.
Wildlife monitoring surveys were conducted utilizing motion-sensitive cameras in the vicinity of RCM's holdings near Superior, Arizona. This study was designed primarily to detect medium to large mammal species in the Resolution Project Area.
Ecological Overview for approximately 60.4 hectares in Maricopa County, Arizona. This ecological evaluation was conducted to identify the type and relative condition of the biological resources found and evaluate ecological characteristics of the property to identify remarkable resources attributes, and to briefly assess their conservation values in reference to local and regional contexts.
This draft technical memorandum has been prepared to summarize results of drilling, construction, and development of groundwater production well RESPW-01. The well was installed to intersect mine workings on the 4400 Mine Level adjacent to Shaft No. 8 of the Magma Mine in order to dewater that level and overlying levels.
Surveys for Arizona Hedgehog Cactus in support of Resolution Copper Mining pre-feasibility and feasibility studies to develop an underground copper mine east of Superior, Arizona. Includes an Access database compiled of all known AHC observed in surveys from 2010 through 2012.
Earth Systems was engaged to conduct kinetic geochemical testwork on tailings samples generated from pilot scale metallurgical testwork for the Resolution Copper Mine.
Fourteen sites were studied to provide baseline technical hydrologic monitoring in the Oak Flat area within or adjacent to the projected disturbance zone of the proposed RC block cave mine.