Breadcrumb

  1. Home
  2. Documents

Documents

Wildlife monitoring surveys were conducted utilizing motion-sensitive cameras in the vicinity of RCM's holdings near Superior, Arizona. This study was designed primarily to detect medium to large mammal species in the Resolution Project Area.

Ecological Overview for approximately 60.4 hectares in Maricopa County, Arizona. This ecological evaluation was conducted to identify the type and relative condition of the biological resources found and evaluate ecological characteristics of the property to identify remarkable resources attributes, and to briefly assess their conservation values in reference to local and regional contexts.

This technical memorandum was prepared to summarize results of drilling and construction at hydrologic test wells PHRES-01, PHRES-02, PHRES-03, and PHRES-04. The wells were installed to provide observation wells during the long-term pumping test at well HRES-09, and to provide locations for characterization of fracture distribution and hydraulic conductivity in the Apache Leap Tuff (ALT) aquifer in the vicinity of hydrologic test well HRES-09.

Yellow-billed cuckoo surveys at four sites in the vicinity of the Resolution Copper Project conducted in 2015. Surveys were conducted at the Whitlow Ranch Dam, two portions of Devils Canyon, and one segment of Mineral Creek, all in Pinal County, Arizona.

The principal objective of this report is to present and review groundwater level and hydraulic head data for the RC hydrologic monitoring network.

This Modeling Plan includes a description of the methods and data sets that are planned to be used in the air quality modeling analyses to estimate the Resolution Project’s air quality impacts relative to the applicable Ambient Air Quality Standards (AAQS) for criteria pollutants.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine is support of a future air quality permit application for the facility.

This report summarizes meteorological measurements collected at the Resolution Copper Mine monitoring system. The purpose of the monitoring program is to provide the measurements necessary to establish existing meteorological conditions at the proposed site of the Resolution Mine in support of a future air quality permit application.

In February 2010, Montgomery published a report entitled "Interim Results of Groundwater Monitoring, Upper Queen Creek and Devils Canyon Watersheds" (M&A 2010) which reported all hydrochemical and isotopic data available through the second quarter of 2009. The current report presents hydrochemical and isotopic data collected since M&A 2010 was published.

This report compares the floodplain and wetlands inventories for five offered lands ("Non-Federal Parcels") to the "Federal Parcel". The Non-Federal Parcels are: JX Ranch, Appleton Ranch, LX Bar Ranch, 6L Ranch, 7B Ranch. The Federal Parcel is also known as the Resolution Parcel, and will be so referenced in this report.