Baseline Reports

The documents listed below represent baseline information collected by Resolution Copper and provided to the Tonto National Forest to be used as a partial basis for the analysis in the EIS. The Tonto National Forest will independently evaluate any data provided by Resolution Copper that is used in the EIS to ensure that it is valid, adequate to support the analysis, and represents the best available science.

This report presents the results of sitespecific probabilistic seismic hazard analyses (PSHA) and deterministic seismic hazard analyses (DSHA) of four sites for the RMC tailings storage facilities options in southern Arizona.

This report summarizes the meteorological, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the first quarter, January 1-March 31, 2013.

The goals of the baseline surface water monitoring program are to: a) Refine understanding of surface water  occurrence, quantity, and quality within the study are b) Develop a baseline data set against which future potential impacts from mining may be measured, and c) Support development of an EIS.

This tech memo has been prepared to summarize results of the Phase II field investigations of the Near West site, conducted in support of RCM's ongoing prefeasibility studies for storage of RCM mine tailings. The purpose of Phase II investigations was to conduct electrical resistivity surveys to assess the potential occurrence of shallow groundwater at the Near West site.

The purpose of the Phase I assessment was to conduct non-invasive field investigations to supplement information obtained previously from published data and to plan Phase III investigations involving subsurface exploration drilling and hydrologic testing.

This report summarizes the meteorological, nitrogen dioxide (NO2), sulfur dioxide (SO2), ozone (O3), and particulate matter (PM) data collected at the Resolution Copper Project near Superior, Arizona for the fourth quarter, October 1-December 31, 2012.

This tech memo presents the first update of the Groundwater Assessment prepared by Golder Associates on behalf of Resolution Copper Mining.  This work is required as part of the Area-Wide Aquifer Protection Permit for the West Plant Site.  Specifically, this tech memo partially fulfills APP Compliance Schedule Item (CSI) No. 2.

Arizona hedgehog cactus surveys conducted in conformance with the monitoring requirements of the Resolution Copper Mining Pre-feasibility Activities Plan of Operations and the Tonto National Forest's Finding of No Significant Impact.

Western Yellow-billed Cuckoo (WYBC) surveys conducted in portions of Devils Canyon and Pinto Creek in Pinal and Gila counties, Arizona.

The purposes of this BE are: 1) to describe the physical and biological features of the Analysis Area, 2) to describe and map the plant communities, and 3) to identify the potential for special status species to occur within the Analysis Area.