Documents Cited - General Plan of Operations

Documents cited in the General Plan of Operations document
Final Report Describing Flotation Testing on Master Cumpusile No. 1 (RES 2C-2, 3-1 and 3A-1) from the Resolution Project

Dawson Metallurgical Laboratories. 2002. Final Report Describing Flotation Testing on Master Composite No. 1 (RES 2C-2, 3-1 and 3A-1) from the Resolution...

PDF icon Download PDF
The Maximum Background Earthquake for the Basin and Range Province, Western North America

dePolo, C.M., 1994, The maximum background earthquake for the Basin and Range Province, western North America: Bulletin of the Seismological Society of America,...

PDF icon Download PDF
Thumbnail image of Arizona Earthquakes book cover Arizona Earthquakes, 1776-1980

DuBois, S.M., A.W. Smith, N.K. Nye, and T.A. Nowak Jr. 1982. Arizona Earthquakes, 1776–1980. Bulletin 193. Prepared by State of Arizona, Bureau of...

PDF icon Download PDF
Surface Complexation Modeling – Hydrous Ferric Oxide

Dzomback, D.A. and Morel F.M.M. (1990) Surface Complexation Modeling – Hydrous Ferric Oxide. New York, John Wiley, 393 p.

PDF icon Download PDF

Draft EIS Released

The Draft Environmental Impact Statement (DEIS) for the Resolution Copper Project and Land Exchange is now available for review under the 'EIS Info' tab.

Draft EIS

Comment on DEIS

Optional ways to comment on the Draft EIS are located under the 'EIS Info' and the 'Public Involvement' tabs.

Comment

Media & General Info

Point of Contact
John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website