Documents Cited - General Plan of Operations

Baker J.W. and Cornell C.A., 2006, Correlation of response spectral values for multi-component ground motions: Bulletin of the Seismological Society of America, v. 96, p. 215-227.

View DetailsDownload PDF

Baker, J.W., 2011, The conditional mean spectrum: A tool for ground motion selection,” American Society of Civil Engineers, Journal of Structural Engineering, v. 137, p. 322-331.

View DetailsDownload PDF

Bausch, D. and Brumbaugh, D.A., 1997, Relocation study of early Arizona earthquakes: Events of 1906, 1910, and 1912: unpublished report prepared for Arizona Division of Emergency Management, Earthquake Program, 65 p. + Appendices.

View DetailsDownload PDF

Bazzurro, P. and Cornell, C.A., 2004, Nonlinear soil-site effects in probabilistic seismic-hazard analysis: Bulletin of the Seismological Society of America, v. 94, p. 2110-2123.

View DetailsDownload PDF

BBE Consulting Morvent Mining. 2012. Resolution Copper Mine Pre-Feasibility Study Refrigeration and Ventilation Strategy. October 2012.

View DetailsDownload PDF

Bieniawski, Z.T. 1989. Engineering Rock Mass Classifications a Complete Manual for Engineers and Geologists in Mining, Civil and Petroleum Engineering.

View DetailsDownload PDF

Boore, D.M., and Atkinson, G.M., 2008, Ground motion predictive equations for the average horizontal component of PGA, PGV, and 5% damped PSA at spectral periods between 0.01s to 10.0s: Earthquake Spectra, v. 24, p. 99-138.

View DetailsDownload PDF

Brown, D.E. (ed). 1994. Biotic Communities of the American Southwest: United States and Mexico. Desert Plants 4(1-4):1-342. University of Utah Press. Salt Lake City.

View DetailsDownload PDF

Brown, David E.; Lowe C. H. 1980. Biotic communities of the Southwest. GTR-RM-78. Fort Collins, CO: US Department of Agriculture, Forest Service. Rocky Mountain Range and Experiment Station.

View DetailsDownload PDF

Brumbaugh, D. S., 1987, A tectonic boundary for the Southern Colorado Plateau: Tectonophysics, v. 136, p. 125-136.

View DetailsDownload PDF

EIS Status Update - March 2019

Screenshot of EIS Status Update document cover

Information on the forthcoming Draft EIS is now available under the ‘EIS Info’ tab. To view the update, click here.

EIS Timeline - Feb 2019

  1. Proponent submits revised Plan of Operations [Sep 2014]
  2. Federal Register Notice of Intent to prepare EIS [Mar 2016]
  3. Public scoping period and scoping meetings
    [5 meetings between Mar-Jun 2016; comment period extended from 60 days to 120 days, closed Jul 18, 2016 ]
  4. Compile and review existing data
  5. Prepare project description and identify project alternatives
  6. Publish Alternatives Evaluation Report [Sep 2017]
  7. We Are Here
    Validate Baseline Information; analyze environmental effects
  8. Prepare Draft EIS
  9. Federal Register Notice of Availability of Draft EIS
  10. 90-day public review and comment period, with public meetings
  11. Respond to public comments and prepare Final EIS
  12. Federal Register Notice of Availability of Final EIS and Draft ROD
  13. 45-day Public Objection Period
  14. Resolve objections to Final EIS and draft ROD
  15. Issue Final Record of Decision

[ View Larger Version ]

Forest Points of Contact

Media & General Info
John Scaggs
jscaggs@fs.fed.us

Project Manager
Resolution Copper
Mary Rasmussen
mcrasmussen@fs.fed.us

Apache Leap Special Management Area
Apache Leap SMA website