Documents Cited - General Plan of Operations

Documents cited in the General Plan of Operations document
Thumbnail image of Resolution Pre-Feasibility Activities Plan of Operations report cover Resolution Pre-Feasibility Activities Plan of Operations

Resolution Copper Mining. 2010. Resolution Pre-Feasibility Activities Plan of Operations (#03-12-02-006). October 1, 2010.

PDF icon Download PDF
Thumbnail image of Resolution Copper Mining Community Working Group Meeting Summaries cover sheet Resolution Copper Mining Community Working Group Meeting Summaries

Resolution Copper Mining. 2013. Resolution Copper Mining Community Working Group Meeting Summaries. June 25, 2013 through July 31, 2013.

PDF icon Download PDF
Thumbnail image of Resolution Copper Land Exchange Proposal - August 2015 Resolution Copper Mining Land Exchange Proposal

Resolution Copper Mining. 2015. Resolution Copper Mining, LLC Land Exchange Proposal. August 2015.

PDF icon Download PDF
Thumbnail image of the General Plan of Operations: Resolution Copper Mining General Plan of Operations

Resolution Copper. 2016d. General Plan of Operations Resolution Copper Mining. Superior, Arizona. May 9.

PDF icon Download PDF - Volume 1
Thumbnail image of Compilation Geologic Map of the Ray-Superior area, Central Arizona report cover Compilation Geologic Map of the Ray-Superior area, Central Arizona

Richard, S.M. and Spencer, J.E., 1998, Compilation Geologic Map of the Ray-Superior area, Central Arizona: Arizona Geological Survey Open-file Report 98-13, 47 p...

PDF icon Download PDF
Thumbnail image of RocLab 1.0 Tutorial Manual cover RocLab 1.0 Tutorial Manual

Rocscience. 2007. Tutorial Manual (pages 1-1 through 1-19).

PDF icon Download PDF
Thumbnail image of Displacement across the Cholame Segment of the San Andreas Fault between 1855 and 1893 from Cadastral Surveys journal article first page Displacement across the Cholame Segment of the San Andreas Fault between 1855 and 1893 from Cadastral Surveys

Runnerstrom, E.E., Grant, L.B., Arrowsmith, J.R., Rhodes, D.D., and Stone, E.M., 2002, Displacement across the Cholame segment of the San Andreas Fault between...

PDF icon Download PDF

Email Address Created for Land Exchange Questions

The Southwestern Region Office of Lands and Minerals Management is overseeing and administering the land exchange and appraisal process which includes the 2,422-acre Oak Flat Federal Parcel. All questions about the land exchange and appraisal process should be emailed to SM.FS.rcexinfo@usda.gov

Objection Period Ends March 1

Interested parties who previously submitted formal comments about the project have until March 1 to file an objection to the Tonto’s proposed decision.

For more info, view TNF News Release.

Programmatic Agreement Info

To comply with Section 106 of the National Historic Preservation Act, the Tonto National Forest developed a Programmatic Agreement (PA) and included it in Volume 5, Appendix O of the final EIS. The PA was created in cooperation with the Advisory Council on Historic Preservation, the State Historic Preservation Office, tribes and other consulting parties. The PA contains an agreed upon process for identifying, evaluating and addressing adverse effects to historic properties associated with this undertaking.

To review Volume 5 and the PA, Download Vol 5 PDF, 27 MB.

Forest Service Point of Contact

John Scaggs
Tonto National Forest
john.scaggs@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website