Breadcrumb

  1. Home
  2. Documents
  3. Baseline Reports

Baseline Reports

The documents listed below represent baseline information collected by Resolution Copper and provided to the Tonto National Forest to be used as a partial basis for the analysis in the EIS. The Tonto National Forest will independently evaluate any data provided by Resolution Copper that is used in the EIS to ensure that it is valid, adequate to support the analysis, and represents the best available science.

In February 2010, Montgomery published a report entitled "Interim Results of Groundwater Monitoring, Upper Queen Creek and Devils Canyon Watersheds" (M&A 2010) which reported all hydrochemical and isotopic data available through the second quarter of 2009. The current report presents hydrochemical and isotopic data collected since M&A 2010 was published.

This technical memorandum was prepared to summarize results of drilling and construction at hydrologic test wells PHRES-01, PHRES-02, PHRES-03, and PHRES-04. The wells were installed to provide observation wells during the long-term pumping test at well HRES-09, and to provide locations for characterization of fracture distribution and hydraulic conductivity in the Apache Leap Tuff (ALT) aquifer in the vicinity of hydrologic test well HRES-09.

This technical memorandum has been prepared to document results and analysis of a 23-day aquifer test conducted at hydrologic test well HRES-09. M&A conducted the long-term test to provide aquifer parameters for the Apache Leap Tuff (ALT) aquifer in the area of the well.

This technical memorandum has been prepared to summarize results of drilling and construction at hydrologic test well DHRES-14. DHRES-14 is located east of Devils Canyon, between the Devils Canyon Fault and JI Ranch Fault. The well was installed to characterize hydrogeologic conditions and provide a monitoring location in the Tertiary Whitetail Conglomerate and Precambrian Pinal Schist. Monitoring data obtained from DHRES-14 will be incorporated into the RCM hydrologic monitoring program.

This technical memorandum has been prepared to summarize results of drilling, construction, and testing at hydrologic test wells HRES-16, HRES-17, and HRES-18. The wells were installed to characterize hydrogeologic conditions in the Apache Leap Tuff (ALT) on the east side of Devils Canyon near the JI Ranch Fault. HRES- 16 is a larger diameter well (nominal 8-inch) that was completed to provide a location for longterm aquifer testing in the ALT aquifer. Monitoring data obtained from HRES-16, HRES-17, and HRES-18 have been incorporated into the RCM hydrologic monitoring program.

This technical memorandum was prepared to summarize results of drilling, construction, and testing at hydrologic test well HRES-13. The well was installed to characterize hydrogeologic conditions and provide a monitoring location in the western part of the Apache Leap Tuff (ALT) aquifer. Monitoring data obtained from HRES-13 have been incorporated into the RCM hydrologic monitoring program.

This technical memorandum has been prepared to summarize the results of drilling, construction, and testing at hydrologic test wells HRES-14 and HRES-15. The wells were installed to characterize hydrogeologic conditions in the Apache Leap Tuff on the east side of Devils Canyon, near the Devils Canyon Fault. Monitoring data obtained from HRES-14 and HRES-15 have been incorporated into the RCM hydrologic monitoring program.

In 1995, the Magma Copper Company discovered a porphyry copper deposit beneath thick postmineral cover 2 km south of the historic Magma mine in Superior, Arizona. Since that time drilling has delineated a large, high-grade, hypogene copper-molybdenum deposit, now named the Resolution deposit, with an inferred resource of 1,624 million metric tons (Mt) at 1.47% Cu and 0.037% Mo.

This technical memorandum has been prepared to summarize results of drilling, construction, and testing at hydrologic test wells DHRES-12 and DHRES-13. Borehole DHRES-12 was drilled to characterize hydrogeologic conditions in the deep groundwater system in Cross Canyon, west of the Apache Leap escarpment, and to provide a monitoring location for the deep groundwater system during ongoing dewatering operations. DHRES-12 was abandoned prior to completion due to lost circulation and borehole instability. Well DHRES-13 was drilled at the same site to replace abandoned borehole DHRES-12.

This technical memorandum was prepared to summarize results of drilling, construction, and testing at hydrologic test well DHRES-09. The well was installed to characterize hydrogeologic conditions in the deep groundwater system west of the Concentrator Fault and east of the Main Fault, and to provide a monitoring point for the deep groundwater system during on-going dewatering operations. Monitoring data obtained from DHRES-09 have been incorporated into the RCM hydrologic monitoring program.