Breadcrumb

  1. Home
  2. Documents
  3. Draft EIS
  4. Documents Cited - Draft EIS
  5. Documents Cited - Draft EIS

Documents Cited - Draft EIS

Thumbnail image of Rock Jock's Guide to Queen Creek Canyon book cover The Rock Jock's Guide to Queen Creek Canyon, Superior, Arizona

Karabin Jr., M. 1996. The Rock Jock's Guide to Queen Creek Canyon, Superior, Arizona. Phoenix, Arizona: MK Productions.

Download PDF
Thumbnail image of email Locations of Historical Pumping

Keay, T. 2018. Locations of historical pumping. Personal communication from Todd Keay, Montgomery and Associates, to Chris Garrett, SWCA Environmental Consultants. Clarification requested regarding DEIS. Email dated December 12, 2018.

Download PDF
Thumbnail image of Additional BADCT Technologies to Reduce Seepage memo cover Alternative 5: Peg Leg Water Balance - Additional BADCT Technologies to Reduce Seepage

Kidner, L., and J. Pilz. 2019. Resolution Copper Mining - Alternative 5: Peg Leg Water Balance - Additional BADCT Technologies to Reduce Seepage. Project No. 1788500.002 TM02 Rev1. Technical memorandum. Lakewood, Colorado: Golder Associates Inc. January 28.

Download PDF
Thumbnail image of Cultural Resources Inventory document cover A Revised Cultural Resources Inventory of the Magma Arizona Railroad Right-of-Way, Pinal County, Arizona

King, A.M., and A. Buckles. 2015. A Revised Cultural Resources Inventory of the Magma Arizona Railroad Right-of-Way, Pinal County, Arizona. Cultural Resources Report 2015-25. ASM Accession No. 2015-0268. Project No. 807.44/807.100. Tucson, Arizona: WestLand Resources, Inc. June 24.

Download PDF
Thumbnail image of Tonto National Forest Land and Resource Management Plan document cover Tonto National Forest Land and Resource Management Plan: Management Indicator Species Status Report

Klein, E., M. Gilbert, S. Lisius, R. Richards, M. Ross, C. Woods, B. Calamusso, D. Pollock, and J. Spencer. 2005. Tonto National Forest Land and Resource Management Plan: Management Indicator Species Status Report. Version 2.0. Revised. Originally prepared in 2002 U.S. Forest Service. July 15.

Download PDF
Thumbnail image of Closure Cover Study memo cover Near West Tailings Storage Facility Closure Cover Study

Klohn Crippen Berger Ltd. 2016. Resolution Copper Project: Near West Tailings Storage Facility Closure Cover Study. Vancouver, Canada: Klohn Crippen Berger Ltd. March.

Download PDF
Thumbnail image of Geotechnical Site Characterization Report cover Near West Tailings Storage Facility, Geotechnical Site Characterization Report

Klohn Crippen Berger Ltd. 2017. Resolution Copper Project: Near West Tailings Storage Facility, Geotechnical Site Characterization Report. 4 vols. Vancouver, Canada: Klohn Crippen Berger Ltd. October 20.

Download PDF - Vol 1 , Download PDF - Vol 2 , Download PDF - Vol 3 , Download PDF - Vol 4
Thumbnail image of DEIS Design for Alternative 3A Near West Modified Proposed Action document cover DEIS Design for Alternative 3A Near West Modified Proposed Action (Modified Centerline Embankment - "Wet")

Klohn Crippen Berger Ltd. 2018a. Resolution Copper Project: DEIS Design for Alternative 3A Near West Modified Proposed Action (Modified Centerline Embankment - "wet"). Doc. # CCC.03-26000-EX-REP-00002 - Rev.0. Vancouver, Canada: Klohn Crippen Berger Ltd. June 8.

Download PDF
Thumbnail image of DEIS Design for Alternative 3B Near West Modified Proposed Action document cover DEIS Design for Alternative 3B Near West Modified Proposed Action (High-density Thickened NPAG Scavenger and Segregated PAG Pyrite Cell)

Klohn Crippen Berger Ltd. 2018b. Resolution Copper Project: DEIS Design for Alternative 3B Near West Modified Proposed Action (High-density Thickened NPAG Scavenger and Segregated PAG Pyrite Cell). Doc. # CCC.03-26000-EX-REP-00005 - Rev.0. Vancouver, Canada: Klohn Crippen Berger Ltd. June 8.

Download PDF
Thumbnail image of DEIS Design for Alternative 4 document cover DEIS Design for Alternative 4 - Silver King Filtered

Klohn Crippen Berger Ltd. 2018c. Resolution Copper Project: DEIS Design for Alternative 4 - Silver King Filtered. Doc. # CCC.03-26000-EX-REP-00006 - Rev.0. Vancouver, Canada: Klohn Crippen Berger Ltd. June 4.

Download PDF
Thumbnail image of DEIS Design for Alternative 6 document cover DEIS Design for Alternative 6 - Skunk Camp

Klohn Crippen Berger Ltd. 2018d. Resolution Copper Project: DEIS Design for Alternative 6 - Skunk Camp. Doc. # CCC.03-81600-EX-REP-00006 - Rev.1. Vancouver, Canada: Klohn Crippen Berger Ltd. August 8.

Download PDF
Thumbnail image of DEIS Design for Alternative 8 - Skunk Camp document cover DEIS Design for Alternative 8 - Skunk Camp

Klohn Crippen Berger Ltd. 2018e. Resolution Copper Project: DEIS Design for Alternative 8 - Skunk Camp. Doc. # CCC.03-81600-EX-REP-00006 - Rev.0. Vancouver, Canada: Klohn Crippen Berger Ltd. June 12.

Download PDF
Thumbnail image of DEIS Alternatives Failure Modes document cover DEIS Alternatives Failure Modes

Klohn Crippen Berger Ltd. 2019a. Resolution Copper Project DEIS Alternatives Failure Modes. Doc. # CCC.03-81600-EX-REP-00011 - Rev.0. Vancouver, Canada: Klohn Crippen Berger Ltd. January.

Download PDF
Thumbnail image of DEIS Alternative 4 Silver King Filtered - Uncaptured Seepage first page DEIS Alternative 4 Silver King Filtered - Uncaptured Seepage

Klohn Crippen Berger Ltd. 2019b. Resolution Copper Project: DEIS Alternative 4 Silver King Filtered - Uncaptured Seepage. Doc. # CCC.03-81600-EX-REP-00010 - Rev.1. Vancouver, Canada: Klohn Crippen Berger Ltd. January 23.

Download PDF
Thumbnail image of DEIS Design for Alternative 6 Skunk Camp, Appendix IV Seepage Estimate Amendment document cover DEIS Design for Alternative 6 Skunk Camp, Appendix IV Seepage Estimate Amendment

Klohn Crippen Berger Ltd. 2019c. Resolution Copper Project: DEIS Design for Alternative 6 Skunk Camp, Appendix IV Seepage Estimate Amendment. Doc. # CCC.03-81600-EX-REP-0006 Rev.2. Vancouver, Canada: Klohn Crippen Berger Ltd. January 30.

Download PDF
Thumbnail image of Summary of DEIS Tailings Alternatives Seepage Control Levels document cover Summary of DEIS Tailings Alternatives Seepage Control Levels

Klohn Crippen Berger Ltd. 2019d. Resolution Copper Project: Summary of DEIS Tailings Alternatives Seepage Control Levels. Doc. # CCC.03-81600-EX-LTR-00001 - Rev.0. Vancouver, Canada: Klohn Crippen Berger Ltd. February 22.

Download PDF
Thumbnail image of Summary of Geological Information document cover Summary of Geological Information Relevant to Development of the Porphyry Cu-Mo Resolution Deposit, Arizona

Kloppenburg, A. 2017. Summary of Geological Information Relevant to Development of the Porphyry Cu-Mo Resolution Deposit, Arizona. Prepared for Resolution Copper. The Hague, Netherlands: 4D Geo - Applied Structural Geology. May.

Download PDF
Thumbnail image of FHWA Highway Construction Noise Handbook cover FHWA Highway Construction Noise Handbook

Knauer, H., S. Pederson, C.N. Reherman, J.L. Rochat, E.S. Thalheimer, M.C. Lau, G.G. Fleming, M. Ferroni, and C. Corbisier. 2006. FHWA Highway Construction Noise Handbook. Washington, D.C.: U.S. Department of Transportation, Federal Highway Administration; Boston, Massachusetts: Parsons Brinckerhoff Quade and Douglas; Harrisburg, Pennsylvania: Environmental Acoustics Inc.; Etobicoke, Canada: Catseye Services. August.

Download PDF